Beasley and Burgess Surveyors were construction surveyors on the Jetty 3 project.
Terrain (formerly Beasley and Burgess Surveyors) were responsible for the accurate set out of all structural elements, some 200 metres offshore, including; 2.4m diameter, 40m long pile casings filled with reinforced concrete that were embedded approximately 24m into the seabed. This survey was undertaken using our Sokkia “GPS” delivering quality results in the difficult environment.